Previously, building permit valuations had to be worked out by hand: staff needed to look up the ICC rate for the occupancy group and construction type, multiplied by square feet, and added the figure into the record.
With the new Valuations calculator, GovWell handles this on your behalf.
🧮 How Does the Valuations Calculator Work?
The Valuations Calculator prices every building permit from one rate table, so valuation fees reflect what AutoCheck reads off the plans, not just the applicant's own estimate.
🚀 Getting Started
In this section we'll show you how you can set up your Valuations so they can be used to calculate fees in applications!
Creating Your Rate Table
Open your Settings page and then look for the Valuations section.
The Valuations page has two tabs: Rate table and Nonstandard rates. If you don't have a table yet, you'll see a No valuation table yet note and two ways to start.
1. Start from the standard classifications
If you select this option, GovWell creates the standard ICC grid of 26 occupancy groups by 9 construction types, with every rate left blank for you to fill in.
2. Upload a valuation rate schedule
This is the fastest route if your jurisdiction already has an adopted schedule.
Click the Upload a valuation rate schedule option.
Choose your file. Our system supports PDFs, CSV/XLSX/SLX or an image (e.g. JPG or PNG) of the rates.
Our system will analyze the file and populate its values into occupancy groups, construction types, and a rate for every cell.
The Check What Was Read window will appear - at this stage nothing is saved yet!
Check the summary at the top of the window and check the yellow box for any cells that could not be read. Each one is listed with the reason (e.g. "H-1 · IA, cell reads "N.P." – not permitted". These cells will stay blank and show as Not read in the preview grid! Our system does not attempt to guess any values if it isn't confident about any values in your tabled.
Select Create table to add the valuation table!
Fill in unpriced cells
After the table is created, any cell that couldn't be read from the uploaded document is displayed as Unpriced. Every rate is per square foot and is typed straight into its cell: click a cell, enter the rate, and confirm. You can change any rate in the grid at any time!
Add Nonstandard Rates
Some work isn't priced by occupancy group and construction type, such as a fences or a solar arrays. You can add these as nonstandard rates, each with its own unit!
Nonstandard rates are not read from an uploaded file. They're manually added to the system so you always add them here whenever needed.
Open the Nonstandard rates tab and select Add rate.
Enter a Name, for example Fence.
Under Priced per, choose the unit the work is priced in, such as per square foot, per linear foot, or per kilowatt.
Enter the Amount for that unit.
Optionally, add a Note with an ordinance reference or explanation.
Select Add rate.
The new rate appears in the list, just like the example above: Fence, $33.00 per linear foot.
Turning on the valuations
When your table is ready, one switch starts charging valuation fees from it. Turn on Charge Valuation Fees From This Table at the top of the Valuations page.
This setting is organization-wide. It applies to every Valuation fee that has not yet been invoiced, so make sure the rates you need are filled in before you turn it on!
💵 Use the Valuation Calculator on a record
Once this setting is on, visit a record with a valuation fee. In the Fees & Deposits tab, the Valuation Calculator will appear right below the invoices and deposits area.
AutoCheck reads the submitted plans and automatically populates the dimensions/quantities in each line on your behalf. However, the system waits for you to confirm if the valuation items are correctly numbered based on what it found. Valuation suggestions added by AutoCheck are indicated by a purple wand icon.
Until they are validated, valuation-based fees show Waiting on valuation and the number of suggested line items.
Each line item includes shows the document it comes from. Click on it to display the exact sheet AutoCheck got the value from.
Confirming line items
Check each suggestion against the plans - use the cited document to confirm if the quantity matches the file!
If a quantity is wrong, edit it in the Quantity field.
Select the check mark to confirm a line, or select Confirm all to confirm every suggestion at once.
Suggested lines are not counted until you confirm them. To add work AutoCheck didn't find, select Add line item.
Confirming the Valuation
After confirming the line items, the system will automatically calculate the valuations.
Below the line items you'll see three figures:
Applicant's estimate, taken from the application's Project Valuation.
Calculated valuation, the total of your confirmed line items.
Valuation, the figure your fees use. Fees are charged on the higher of the calculated valuation and the applicant's estimate.
Both figures stay visible for analysis. Based on the image above, the system projected a valuation higher than the applicant's $450,000 estimate, so the estimate is struck through and the calculated valuation is used.
Overriding the Valuation
Select Override valuation to replace the valuation with a single figure of your own. The window shows the calculated valuation and tells you how far your amount is from it. Select Save override to apply it, or Use calculated valuation to go back to the calculated figure!
🤔 What if the Applicant Uploads Revised Plans?
When a revision comes in, AutoCheck reads the new plans again and updates the suggestions if needed.
A note above the table summarizes what changed, for example: Valuation line items were updated from the latest plans and answers: 2 changed, 2 added, 1 removed, 1 not in the latest revision.
Look for these markers on each item:
Updated by the latest reading. The suggestion follows the new plans and shows what it was before. For example, was 2,608 sq ft is struck through, and the line needs confirming again.
New lines. Work found only in the revision appears as a new suggestion, for example a detached accessory building.
Not in latest revision. A confirmed line that the new plans dropped is flagged, not removed, so you can decide whether it still belongs.
You'll just need to confirm any updated items to bring the valuation back up to date!
🧊 Valuation Freeze
Once every line is confirmed and the invoice goes out, the valuation freezes with it so the invoice always matches what was calculated.
To change a frozen valuation, you first need to void the issued invoice. Furthermore, Plan Revisions no longer change the valuation after the invoice is created, and changing a rate in your table later never moves a fee that has already been charged!
❓ FAQ and troubleshooting
Why were some cells left blank when I uploaded my schedule?
Cells the reader couldn't read, such as ones that read "N.P." (not permitted), are listed with the reason and left blank. Our system does not try to guess the values.
Can I change a rate after the table is created?
Yes. Everything in the grid can be changed afterwards in the Valuations page, and a rate change never moves a fee that has already been charged.
Why do my fees say "Waiting on valuation"?
That messge means the valuation isn't ready yet! Please be sure to confirm every suggested line item, or override the valuation with your own.
Why can't I send the invoice?
Send invoice is only available once every line item is confirmed and priced, or an override is set.
Why is the applicant's estimate crossed out?
Fees are charged on the higher of the calculated valuation and the applicant's estimate, and both are shown. In the example in this article, the table prices the project higher, so the applicant's estimate is struck through.
How do I turn this off?
Switch off Charge Valuation Fees From This Table. When it's off, Valuation fees work as they do today.